Quantcast
Viewing all articles
Browse latest Browse all 183139

Brady Burcham of Time Striping removes the final roadblock Thursday to open the newly upgraded secti

Image may be NSFW.
Clik here to view.
Brady Burcham of Time Striping removes the final roadblock Thursday to open the newly upgraded section East Central Avenue between East A and J Streets in Bentonville. The roadway, which has been closed down since October 2011, includes several beautification features, sidewalks and brand new water, sewer and storm drain lines.
STREET UPGRADES

Photo by

Brady Burcham of Time Striping removes the final roadblock Thursday to open the newly upgraded section East Central Avenue between East A and J Streets in Bentonville. The roadway, which has been closed down since October 2011, includes several beautification features, sidewalks and brand new water, sewer and storm drain lines. STREET UPGRADES


Viewing all articles
Browse latest Browse all 183139

Trending Articles